×

dam top meaning in English

坝顶

Examples

  1. Contracted with the calculations of dam in rigid foundation , the frequencies are lesson and periods of dam are lengthened because of elastic restraint of foundation . and under earthquake load , the maximum displacement of dam top is larger
    与刚性地基下坝体计算结果相比,由于地基的弹性约束作用,坝体的自振频率降低,周期延长;且在地震荷载作用下,坝顶最大动位移增大。
  2. In the program , the effect of lamination placement , construction interval , elastic modulus change , thermal insulation change , surrounding temperature change , concrete creep and autogenous volume change on thermal stress are considered . and such temperature control measurement as water pipe cooling , heat preservation of the dam surface , the pouring temperature control , the overflow across the dam top during flood season can also be simulated by numerical method
    该程序在编制过程中考虑了混凝土分层浇筑、施工间歇、弹模变化、绝热温升过程、环境温度的变化、混凝土徐变、自生体积变形等因素对坝体温度场及温度应力场的影响,同时也考虑了水管冷却、坝体表面保温、控制浇筑温度、施工汛期坝顶面过水等各种温控措施的数值模拟。

Related Words

  1. karaj dam
  2. high dam
  3. stoplog dam
  4. dam retting
  5. farm dam
  6. coulee dam
  7. torquay dam
  8. dam breach
  9. wilson dam
  10. dam busters
  11. dam thuy
  12. dam toe
  13. dam type hydropower station
  14. dam type liladle
PC Version

Copyright © 2018 WordTech Co.